1.28 acres, Scheme to be prepared
![]() |
The Waste Management division operates its own landfill facility in Cambridgeshire, with a remaining void capacity in excess of 300,000m3 from a total void of 2,000,000m3. |
The site is operated to the highest environmental standards, accepts non-hazardous waste streams as well as inert material for site restoration and features an Electricity Generation Plant, which supplies 1MW to the National Grid.
Call Woodford Waste Management directly on 01487 824240.